Eurasia Tunnel

Evaluation of the damages on reinforced concrete buildings due to tunnel and connection lines excavations on relevant sites

Client: Yapı Merkezi S&K JV Location: İstanbul Site Area (m2): Year of Completion: 2015

İstanbul Anadolu Juctice Court

Preparation of an intervention proposal for Istanbul Adalet Sarayı H block based on the on-site investigation and the finite element model of the building

Client: NEORAY-YAPI ve YAPI-ATZ JV Location: İstanbul Site Area (m2): 7500 Year of Completion: 2018

Abbott Nutrition Factory

Preparation of a retrofit solution for the factory using DowAksa Carbon Fiber Polymer products

Client: DowAksa Location: India Site Area (m2): Year of Completion: 2018

Kuzey Marmara Highway Tunnes

Simple bending calculations and comparison of normal force - moment curvature diagrams of steel fiber reinforced concrete tunnel supports

Client: BEKAERT Location: İstanbul Site Area (m2): Year of Completion: 2017

Navajo Pride Water Lines

Preparation of the retrofit project of prestressed reinforced concrete cylinder pipes

Client: DowAksa Location: United States Site Area (m2): Year of Completion: 2017

Denizli Honaz Tunnel Project

Check of the compatibility of the inner cladding principles of steel fiber reinforced concrete produced by the company for the tunnel cladding concrete design used in the project with the fib Model Code 2010

Client: BEKAERT Location: Denizli Site Area (m2): Year of Completion: 2016

Kartal - Sabiha Gokçen Metro Line

Assessment of effects of differential soil settlement due to tunnel excavation on 15 buildings located near Sabiha Gökçen Airport Railway Connection

Client: Gulermak-YSE JV Location: İstanbul Site Area (m2): 5000 Year of Completion: 2018