Selimiye Mosque

Earthquake performance assessment, determination of intervention and restoring methods

Client: General of Turkish Foundations Location: Edirne Site Area (m2): Year of Completion: 2018

Divriği Great Mosque and Hospital

Assesment of current earthquake performance, determination of intervention and restoring methods, structural health monitoring during the restoration works and design of a steel support system

Client: Kadıoğlu - Dor Construction Location: Sivas Site Area (m2): Year of Completion: 2019

Beyazit Mosque

Earthquake performance assesment, determination of intervention and restoring methods

Client: Yılmaz Construction Location: İstanbul Site Area (m2): Year of Completion: 2017

Basilica Cistern

Earthquake performance assesment, determination of intervention and restoring methods

Client: Hera Restoration Location: İstanbul Site Area (m2): Year of Completion: 2017

Spice Bazaar

Statical assesment of restoration project and preparation of intervention suggestions

Client: Taksim Construction Location: İstanbul Site Area (m2): Year of Completion: 2014

Davutpaşa Mosque

Statical assesment of restoration project and preparation of intervention suggestions

Client: Kübra Construction Location: İstanbul Site Area (m2): Year of Completion: 2016

Hagia Sophia Museum

Preparation of intervention suggestions regarding the damage on the north arch of the main dome

Client: Ministry of Culture of Turkey Location: İstanbul Site Area (m2): Year of Completion: 2017

Teşvikiye Mosque

Statical assesment of the restoration project and preparation of intervention suggestions

Client: ALBA Restoration Location: İstanbul Site Area (m2): Year of Completion: 2018

Studios Monastery

Statical assesment of the restoration project and preparation of intervention suggestions

Client: Yavuz Arch. Location: İstanbul Site Area (m2): Year of Completion: 2018

Topkapı Palace

Statical assesment of the restoration project and preparation of intervention projects of the treasury building

Client: Özbersan Construction Location: İstanbul Site Area (m2): Year of Completion: 2018

Terra Santa Churches

Preparation of intervention projects based on the structural analyses of 11 structures of the church done through the finite element model of each structure

Client: Kadıoğlu - Dor Construction Location: İstanbul Site Area (m2): Year of Completion: 2019

Silivri Mimar Sinan Bridge

Preparation of an intervention suggestion based on the finite element model of the bridge representing the bridge status after the restoraion is completed

Client: Kubra Construction Location: İstanbul Site Area (m2): Year of Completion: 2018

Haseki Sultan Mosque

Preparation of intervention suggestions based on the on-site investigations and the finite element model of the mosque

Client: Kubra Construction Location: İstanbul Site Area (m2): Year of Completion: 2017

Molla Çelebi Mosque

Preparation of itervention suggestions by evaluating in-situ observations, laboratory experiments and statical analysis

Client: Taksim Construction Location: İstanbul Site Area (m2): Year of Completion: 2013

Küçük Mustafa Paşa Bath

Preparation of intervention solutions by evaluating in-situ observations and finite elemet model of the structure

Client: Pelin Çelik Arch. Location: İstanbul Site Area (m2): Year of Completion: 2014

Molla Fenari İsa Mosque

Preparation of intervention suggestions based on on-site observations and the finite element model of the structure

Client: Yılmaz Construction Location: İstanbul Site Area (m2): Year of Completion: 2014

Sinanpasa Mosque

Determination of the effects of differential soil settlements due to subway line and station excavations on Sinanpasa Mosque and Molla Celebi Mosque

Client: Alsim-Alarko JV Location: İstanbul Site Area (m2): Year of Completion: 2015

Please bring your device upright.

Sending...